-
18¢ per pound*
*Plus freight.
Call 1-800-611-6109 for a freight quote
or email: premierinfo@earthlink.net |

Rubber is delivered in 2000 pound
super sacks.
Mixing and distribution of rubber
will be
the
buyer's responsibility. |
20 x 60 meter arena (66' x 197')
1/2" rubber footing - 16,000 lbs.
|
$2880 |
 |
20 x 60 meter arena (66' x 197')
1" rubber footing - 32,000 lbs.
|
$5760 |
 |
20 x 40 meter arena (66' x 131')
1/2" rubber footing - 12,000 lbs. |
$2160 |
 |
20 x 40 meter arena (66' x 131')
1" rubber footing - 24,000 lbs.
|
$4320 |
 |
When choosing rubber footing, note that sizes larger
than 1/2 inch may still contain metals and may also
become slippery when wet, while pieces smaller than
1/4 inch may pack down and prohibit proper drainage.
The ratio of rubber footing to sand varies depending
on how the riding surface will be used.
We recommend:
Dressage: Mix 1-1/2" of sand with 1/2" rubber.
Hunter/Jumper: Mix 1" of sand with 1" rubber.
Total footing depth (including sand) not to exceed 2 1/2 inches. |

|
| Use this equation to calculate the tons needed for your desired depth of footing. |
Desired
Depth |
Width |
x |
Length |
= |
Total Footage |
x |
Depth
Factor |
= |
Total
Pounds |
| 1/2" |
|
x |
|
= |
|
x |
1.25 |
= |
|
| 1" |
|
x |
|
= |
|
x |
2.50 |
= |
|
| 1 1/2" |
|
x |
|
= |
|
x |
3.75 |
= |
|
| 2" |
|
x |
|
= |
|
x |
5.00 |
= |
|
| 2 1/2" |
|
x |
|
= |
|
x |
6.25 |
= |
|
| 3" |
|
x |
|
= |
|
x |
7.50 |
= |
|
|
Order early during the summer months as supplies often run low due to
high demand!
Click here to read a ProStride™ testimonial. |